From planning and design to project management and construction, the Makin Trax team brings a unique philosophy and methodology to a field that is often dominated by a one-size fits all approach.
Makin Trax believes our success has developed from our attention to detail, the comprehensive understanding of what the end-user requires and a very broad skill-set that brings flexibility and creative solutions to all projects.
Makin Trax knows there is great potential to inject a more professional, scientific and thoughtful approach to tracks and track-building in Australia and the world. Our design methodology results in experience focused track construction that is unrivalled.
The Makin Trax team delivers innovative, sustainable and value for money outcomes that provide an unforgettable experience and legacy for track users.
Case Studies
-
Mt Rodgers Primary School Adventure Trail
Scope To create an adventure trail that provides a space for the students to run, ride and walk that is also an attractive addition to the landscape whilst providing a functional natural play space for the children. Read more
-
Melrose High School
Scope To construct a bike skills track for the students and enhance the existing bike skills program being run by the school. Read more
-
Macgregor Primary School landscaping
Scope To create a natural play space with stepping stones, large boulder rocks and a climbing wall. Read more
-
Yarralumla Montessori School natural play space
Scope To create a rock garden that is also an attractive addition to the landscape whilst providing a functional natural play space for the children Challenges Read more
-
Ainslie Primary School
Scope To create an adventure trail that provides a space for the students to run, ride and walk that is also an attractive addition to the landscape whilst providing a functional natural play space for the children. Read more
-
Mt Awawang trails
Scope Repair and upgrade trails within the precinct. Challenges Read more
-
Ridgeline Park, Denman Prospect
Scope To design and construct 1.2km of multi-use trail in a bush block at Denman Prospect as a piece of community infrastructure, based on the design concept of our work at the Botanic Gardens. Read more
-
Black Mountain Summit Trail
Makin Trax refurbished, and in one section re-aligned, a degraded and dangerous trail in a high use zone. Read more
-
Stromlo Forest Park
From 2005 to Feb 2021 Makin Trax designed, constructed and maintained all of the trails and infrastructure at Stromlo Forest Park. Read more
-
Black Mountain Walking Trail
Makin Trax designed and constructed a 1.6km walking trail as an extension to the Australian National Botanic Gardens, on Black Mountain in the ACT. Read more