New foot bridge for Jerrabomberra Wetlands

25 Oct 2012

Earlier this year Makin Trax was called upon to asses and recommend a course of action for an old timber bridge in the wetlands.  In consultation with our specialist engineer it was determined that the bridge should be closed and condemned due to non compliance with safety standards and lack of structural integrity for the given purpose.  Makin Trax subsequently designed constructed and installed a new steel bridge with Makin Trax Saftey Deck to replace the condemned structure.